1. *. Planning  
2. *. Installation
3. *. Maintenance Contract

enginnger   enginnger   enginnger

1.Planning :

Success or failure of a sewage treatment systems depends on the initial planning. Hydraulic and Organic Load Calculation Load of each place is very varied and have different characteristics.

We are ready to help you to perform calculations, product selection and installation position with regard to design, efficiency, time, cost, ease of maintenance and of course without compromising aesthetics at the sewage treatment system will be applied
.
2. Installation There are 3 types of installations that affect the amount of hydraulic load.

1. All House Hold Installation (recommended proper installation)

services 01


2. Bath Room
installation

services 02


3. Water Closet only
installation

services 03

3. Maintenance
contract work items:
To ensure that installed systems are well maintained, and the results of effluent water treatment to maintain the quality we offer maintenance contracts for STP is installed, the contract and the contract price will adjust to the location and size of the installed system.

Maintenance contract work items:

no Occupation Length
    Total  Period
1  Panel & Blower Maintenance    
   - Cleaning Filter Blower 1 per week 1 per week
   - Check pressure switch 1 per week
   - Check the blower indicator light  1 per week
   - Checking pressure Blower 1 per week
   - Checking the sand filter and back wash 1 per week
   - Clean room panels  1 per week
       
2  Effluent Chamber    
   - Checking the physical quality of water 1 per week
   - Checking floating switch 1 per week
   - Checking Submersible Pump 1 per week
   - Inspection clogs drain pipes 1 per week
       
3 Repair & replacement periodically charged    
   - Replacement filter blower  1 per 6 Months
   - Replacement of sand filters and charcoal media 1 per 6 Months
   - Replacement of other equipment if necessary
   - Checking the quality of wastewater in laboratotium 1 per 3 Months
   - Checking of BOD, COD, TDS, & E Coli    
   - Desludging if necessary